• Mi Re-Unir
    Búsqueda Avanzada
    JavaScript is disabled for your browser. Some features of this site may not work without it.
    Ver ítem 
    •   Inicio
    • UNIR REVISTAS
    • Revista IJIMAI
    • 2020
    • vol. 6, nº 4, december 2020
    • Ver ítem
    •   Inicio
    • UNIR REVISTAS
    • Revista IJIMAI
    • 2020
    • vol. 6, nº 4, december 2020
    • Ver ítem

    The Construction Site Management of Concrete Prefabricated Buildings by ISM-ANP Network Structure Model and BIM under Big Data Text Mining Analytic Network Process (ANP)

    Autor: 
    Xu, Guiming
    Fecha: 
    12/2020
    Palabra clave: 
    analytic network process (ANP); big data; text mining; building; information model (BIM); construction management; interpretative structural model (ISM); IJIMAI
    Revista / editorial: 
    International Journal of Interactive Multimedia and Artificial Intelligence (IJIMAI)
    Tipo de Ítem: 
    article
    URI: 
    https://reunir.unir.net/handle/123456789/12839
    DOI: 
    https://doi.org/10.9781/ijimai.2020.11.013
    Dirección web: 
    https://www.ijimai.org/journal/bibcite/reference/2856
    Open Access
    Resumen:
    In the construction industry, prefabricated buildings have developed rapidly in recent years due to their various excellent properties. To expand the application of big data text mining and Building Information Model (BIM) in prefabricated building construction, with concrete as a form of expression, the construction management of concrete prefabricated buildings is discussed. Based on the Interpretative Structural Model (ISM) and Analytic Network Process (ANP), the importance of the safety factors on the construction sites of concrete prefabricated buildings are assessed. Based on BIM, an optimized construction management platform for concrete prefabricated buildings is built, whose realization effects are characterized. The results show that prefabricated buildings have developed rapidly from 2017 to 2019. Compared with traditional buildings, they can significantly reduce the waste of resources and energy, and the savings of water resource utilization can reach 80%. Among the various safety impact elements, construction management has the greatest impact on construction safety, and the corresponding weight value is 0.3653. The corresponding weight of construction personnel is 0.2835, the corresponding weight of construction objects is 0.1629, the corresponding weight of construction technology is 0.1436, and the corresponding weight of construction environment is 0.0448. This building construction management platform is able to control the construction progress in real-time and avoid the occurrence of construction safety accidents. The final layout of the construction site shows a good effect, and the deviation between the actual construction schedule and the expected construction schedule is small, which is of great significance for the smooth development of concrete prefabricated buildings. This is a catalyst for the future development of concrete prefabricated buildings and the application of big data technology.
    Mostrar el registro completo del ítem
    Ficheros en el ítem
    icon
    Nombre: ijimai_6_4_15.pdf
    Tamaño: 956.7Kb
    Formato: application/pdf
    Ver/Abrir
    Este ítem aparece en la(s) siguiente(s) colección(es)
    • vol. 6, nº 4, december 2020

    Estadísticas de uso

    Año
    2012
    2013
    2014
    2015
    2016
    2017
    2018
    2019
    2020
    2021
    2022
    2023
    2024
    2025
    Vistas
    0
    0
    0
    0
    0
    0
    0
    0
    0
    0
    94
    108
    173
    169
    Descargas
    0
    0
    0
    0
    0
    0
    0
    0
    0
    0
    32
    116
    79
    89

    Mi cuenta

    AccederRegistrar

    ¿necesitas ayuda?

    Manual de UsuarioContacto: reunir@unir.net

    Listar

    todo Re-UnirComunidades y coleccionesPor fecha de publicaciónAutoresTítulosPalabras claveTipo documentoTipo de accesoEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras claveTipo documentoTipo de acceso






    Aviso Legal Política de Privacidad Política de Cookies Cláusulas legales RGPD
    © UNIR - Universidad Internacional de La Rioja
     
    Aviso Legal Política de Privacidad Política de Cookies Cláusulas legales RGPD
    © UNIR - Universidad Internacional de La Rioja